SERVICESPREVENTIVE MAINTENANCE & INSPECTION

Planned maintenance of the entire measuring chain.

Many faults develop gradually: a filter clogs, a flow drops, condensation returns or an analyser starts to drift. Planned maintenance and recurring inspection reveal the change before it leads to missing data.

INCLUDED
  • Preventive maintenance at an agreed interval, for example monthly or quarterly
  • Inspection of the entire measuring chain against the ARKTEC 7-Stage checklist
  • Replacement of filters, wear parts and consumables
  • Zero and span checks with zero gas and calibration gas
  • Functional checks of sampling, sample conditioning, analyser and signal
  • Inspection reports and updated technical history
  • Supporting data for your QAL3 work under the EN 14181 standard, with trend and status reports

Can be ordered as individual visits or as part of a service agreement.

SCOPE

We carry out technical checks, adjustments and calibrations with calibration gas. We do not carry out accredited measurements such as QAL2 and the annual surveillance test (AST), nor accredited calibration. As the operator, you remain responsible for QAL3. We perform the checks, manage the records and deliver trend and status reports.

QAL3, QAL2 AND AST

QAL3 is the ongoing quality assurance during operation: regular checks of zero and span that are followed over time, so that drift is detected in good time. QAL2 and the annual surveillance test (AST) are parallel measurements carried out mainly by an accredited laboratory. All three are part of EN 14181. For measuring systems under the Swedish NOx charge, the checks are adapted to the applicable requirements.

Read more about QAL3 →
DELIVERABLE

Inspection report, actions taken, identified deviations and recommended follow-up.

Walkway along process piping with sampling point and sample line
01
Process / measurement point
POSITION · FLOW PROFILE · TEMPERATURE · MOISTURE · DUST
02
Sample extraction / sampling
PROBE · FILTER · GASKETS · LEAK-TIGHTNESS · HEATING
03
Sample line
HEATED ZONES · JOINTS · LEAKS · RISK OF CONDENSATION · LOW POINTS
04
Sample conditioning
COOLER · FILTERS · PUMPS · CONDENSATE DRAIN · FLOW
05
Analyser
OPERATING STATUS · RESPONSE · ZERO · SPAN · REFERENCE GAS
06
Signal & data
SIGNAL TRANSMISSION · SCALING · UNITS · STATUS
07
Reported result
RESULT · STATUS · TECHNICAL HISTORY